Sign In | Join Free | My gimpguru.org
China AARE CUN TAI THERMAL LTD. logo
AARE CUN TAI THERMAL LTD.
Living by sincerity, diligency and efficiency
Active Member

7 Years

Home > Embedded Fin Tube >

Carbon Steel Embeded G Type Fin Tubes , Heat Exchanger Finned Tubes

AARE CUN TAI THERMAL LTD.

Carbon Steel Embeded G Type Fin Tubes , Heat Exchanger Finned Tubes

Brand Name : JYCT

Model Number : G-5

Certification : ISO9001:2008 authorized by SGS

Place of Origin : JIANGSU,CHINA

MOQ : customized

Price : Negotiable

Supply Ability : 50 tons per day

Delivery Time : Within 45 days after received your deposits

Packaging Details : Strong Plywood Case With Steel Frame

Fins Type : Solid, Plain

Port : Shanghai

Payment Terms : T/T in Advance, or Irrevocable L/C at Sight

Material : Stainless Steel+Stainless Steel, Carbon Steel+Carbon Steel, Alloy+Alloy etc.

Bare Tube OD : 16-63mm

Fin Pitch : 2.1-5mm

Contact Now

G(Embeded) fin tube

Base tube material: SA179 SMLS OD25.4 x THK2.77(MW) x 8900L
Fin Material: AL1060; OD57.15mm x 0.4mm THK x 11FPI


Carbon Steel Embeded G Type Fin Tubes , Heat Exchanger Finned TubesApplication: Heater Parts, Heater or Heat Exchanger Parts
Capacity: 9000meters/day


Manufacturing Process:
Fin is embedded into the outer wall of the tube, but gives no surface protection. Ingeneral use for continuous process applications; ie refineries, petrochemical,fertilizer and gas plants.
Upper temperature limit: 450°C



Material: Carbon Steel, Copper Stainless Steel, Alloy, Aluminium
Bare tube OD: 16-63mm Fin Pitch: 2.1-5.0mm Fin Height: <17mm Fin Thick: About 0.4mm

Name

Base tube
(OD) mm

Fin Pitch
(mm)

length
(m)

Min Max Min Max Min Max
Extruded aluminum fin tube 8 51 1.6 10 0.5 20
L/LL/KL aluminum fin tube 16 63 2.1 5 0.5 15
Embedded aluminum fin tube 16 63 2.1 5 0.5 15
Low fin tube 10 38 0.6 2 0.5 20
Spiral fin tube 12.7 70 0.5 20
ERW HF spiral fin tube 16 219 3 25 0.5 28
ERW HF spiral serrated fin tube 16 219 3 25 0.5 28

Serrated width(mm)
10 min~26 max

Serrated depth(mm)
4 min~16 max

ERW studded tube 25 219 8 30 2 15
DC ERW H/HH fin tube 25 63 8 30 1 15
H/HH fins

Length(mm)
60 min-150 max

Thickness(mm)
1.5 min~4 max

Width(mm)
30 min~50 max


Products&Inspection:


Carbon Steel Embeded G Type Fin Tubes , Heat Exchanger Finned Tubes



Carbon Steel Embeded G Type Fin Tubes , Heat Exchanger Finned Tubes



Carbon Steel Embeded G Type Fin Tubes , Heat Exchanger Finned Tubes




Following documentations should be reviewed & endorsed:

Incoming inspection report for raw material including bare tube/alu.tube / alu. strip / steel strip
Mill test cetification for bare tube
Mill test cetification for fin (alu.tube / alu. strip / steel strip)
Mill test cetification for finned tube
Finned tubes dimension & visual inspection reports

Packaging Details:

seaworthy with plastic cap for each edge of core tube,finned tubes shall be put on the metal frame with wooden walls and plastic layer be considered between tubes rows to avoid damage and deformation of the fins

Carbon Steel Embeded G Type Fin Tubes , Heat Exchanger Finned Tubes






FAQ

About our company
A------We have three company,
1. Aare Cun Tai Thermal Co., Ltd (Hong Kong, China)
2.Jiang Yin Cun Tai Thermal Equipment Co., Ltd (Jiangsu, China)(Mill)
3.Jiang Yin Aare International Trading Co.,Ltd. (for export procedure)
Besides the companies above mentioned, we don’t have any other name.

About Our main business
A------DR(Extruded) / L(Wrapped) / LL(Overlapped) / KL-KLM (Knurled) / G(Embeded) Fin Tube;
High Frequency Welding Fin Tube,Studded Tube, H/HH/Square Fin Tube,Longitudinal Tube;
Elbows, Low Fin Tube,Spiral Tube, U bend , Corrugated Tube.

About Price terms
A------It could be EXW, FOB,CIF,CNF

About Payment Term
A------We usually accept payment by T/T in advance or by L/C available against draft at sight

About Lead Time
A------Usually it takes about 35-45 days after we received your confirmation.
However, it would depend on our production line schedule(the timing clients place order)and the complication of the item.

About Quality Control
A----
Incoming inspection report for bare tube/alu.tube / alu. strip / steel strip
Mill test cetification for bare tube
Mill test cetification for fin (alu.tube / alu. strip / steel strip)
Mill test cetification for finned tube
Finned tubes dimension & visual inspection reports


About Sample
A---If you are interested in our above products, please contact us.
We can provide small samples in store for you, and you are welcome to visit visit our factory

Our moulds can be customized,you could kindly leave an inquiry to know more details about price, packing and shipping.




Product Tags:

g finned tubes

      

finned aluminum tubing

      
Quality Carbon Steel Embeded G Type Fin Tubes , Heat Exchanger Finned Tubes wholesale

Carbon Steel Embeded G Type Fin Tubes , Heat Exchanger Finned Tubes Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: AARE CUN TAI THERMAL LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)