Sign In | Join Free | My gimpguru.org
China AARE CUN TAI THERMAL LTD. logo
AARE CUN TAI THERMAL LTD.
Living by sincerity, diligency and efficiency
Active Member

7 Years

Home > Carbon Steel Finned Tubes >

SA335 P5 Welded Studded Tube For Furnaces And Fired Heaters Corrosion Resistant

AARE CUN TAI THERMAL LTD.

SA335 P5 Welded Studded Tube For Furnaces And Fired Heaters Corrosion Resistant

Brand Name : JYCT

Model Number : Studded-16

Certification : ISO9001:2008 authorized by SGS

Place of Origin : JIANGSU,CHINA

MOQ : customized

Price : Negotiable

Supply Ability : 50 tons per day

Delivery Time : Within 45 days after received your deposits

Packaging Details : as per export packing standard

Year Established : 2008

Material : Stainless Steel+Stainless Steel, Carbon Steel+Carbon Steel, Alloy+Alloy etc.

Payment Terms : T/T in Advance, or Irrevocable L/C at Sight

Size : customized

Bare Tube OD : 25-219mm

Fin Pitch : 8-30mm

Contact Now

Studded tube apply in furnaces and fired heaters

Base tube material: SA335 P5 OD114.3mmX6.02X6900mmL

Fin Material: Q235B 12.7mmHX6.35mmdx2FPI

Manufacturing Process:
The studs are attached to the pipe indiametrically opposing pairs around the circumference by electrical resistancewelding to ensure a high integrity bond for strength and heat flow.


Application: studded tube are used in furnaces and fired heaters as an alternative tohigh frequency welded finned tubes wherever the process application is such that heavy fouling of the surface may occur.
Capacity:Three ERW studding lines, daily capacity around 120000 studs;
Material:Stainless Steel+Stainless Steel, Carbon Steel+Carbon Steel, Alloy+Alloy etc.
Bare tube OD: 25-219mm Fin Pitch: 8-30mm Fin Height: 5-35mm Stud: Ф5-20mm

Name

Base tube
(OD) mm

Fin Pitch
(mm)

length
(m)

MinMaxMinMaxMinMax
Extruded aluminum fin tube8511.6100.520
L/LL/KL aluminum fin tube16632.150.515
Embedded aluminum fin tube16632.150.515
Low fin tube10380.620.520
Spiral fin tube12.770 0.520
ERW HF spiral fin tube162193250.528
ERW HF spiral serrated fin tube162193250.528

Serrated width(mm)
10 min~26 max

Serrated depth(mm)
4 min~16 max

ERW studded tube25219830215
DC ERW H/HH fin tube2563830115
H/HH fins

Length(mm)
60 min-150 max

Thickness(mm)
1.5 min~4 max

Width(mm)
30 min~50 max



Products:

SA335 P5 Welded Studded Tube For Furnaces And Fired Heaters Corrosion Resistant

Raw material:
SA335 P5 Welded Studded Tube For Furnaces And Fired Heaters Corrosion Resistant


Welding


SA335 P5 Welded Studded Tube For Furnaces And Fired Heaters Corrosion Resistant


SA335 P5 Welded Studded Tube For Furnaces And Fired Heaters Corrosion Resistant

Description of the inspections carried out
Following documentations should be reviewed & endorsed:
1. Declaration of conformity,
2. Inspection plan,
3. Welding book(WPS & PQR),
4. Finned tubes examination reports
(dimension & visual inspection, hardness test report, tensile test report),
5.Test samples sheet,
6.Incoming inspection report,
7.Inspection certificate for bare tube,
8.Quality test certificate for steel strip,
9.Iinspection & Guarantee certificate for finned tube,
10.Product inspection report.




Packaging: sea worthy with plastic cap for each edge of core tube , finned tubes shall be put on the metal frame with wooden walls and plastic layer be considered between tubes rows to avoid damage and deformation of the fins

SA335 P5 Welded Studded Tube For Furnaces And Fired Heaters Corrosion Resistant

FAQ

About our company
A------ We have three company,
1. Aare Cun Tai Thermal Co., Ltd (Hong Kong, China)
2. Jiang Yin Cun Tai Thermal Equipment Co., Ltd (Jiangsu, China)(Mill)
3. Jiang Yin Aare International Trading Co.,Ltd. (for export procedure)
Besides the companies above mentioned, we don’t have any other name.

About Our main business
A------ DR(Extruded) / L(Wrapped) / LL(Overlapped) / KL-KLM (Knurled) / G(Embeded) Fin Tube;
High Frequency Welding Fin Tube,Studded Tube, H/HH/Square Fin Tube,Longitudinal Tube;
Elbows, Low Fin Tube,Spiral Tube, U bend , Corrugated Tube.

About Price terms
A------ It could be EXW, FOB,CIF,CNF

About Payment Term
A------ We usually accept payment by T/T in advance or by L/C available against draft at sight

About Lead Time
A------ Usually it takes about 35-45 days after we received your confirmation.
However, it would depend on our production line schedule(the timing clients place order)and the complication of the item.

About Quality Control
A----
Incoming inspection report for raw material including bare tube/alu.tube / alu. strip / steel strip
Mill test cetification for bare tube
Mill test cetification for fin (alu.tube / alu. strip / steel strip)
Mill test cetification for finned tube
Finned tubes dimension & visual inspection reports


About Sample
A--- If you are interested in our above products, please contact us.
We can provide small samples in store for you, and you are welcome to visit our factory

Our moulds can be customized,you could kindly leave an inquiry to know more details about price, packing and shipping.







































































































Product Tags:

metal finned tube

      

seamless fin tube

      
Quality SA335 P5 Welded Studded Tube For Furnaces And Fired Heaters Corrosion Resistant wholesale

SA335 P5 Welded Studded Tube For Furnaces And Fired Heaters Corrosion Resistant Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: AARE CUN TAI THERMAL LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)